Skip to main content

Straight answers.

The things people ring up and ask, answered the way Mark answers them on the phone. If yours is not here, call him.

Money and land first.

Because they are always the first two phone calls.

What does a foundation cost?

From $112.00/m² for a TC1 polystyrene raft. The full board is on this page, and your section, your TC class and your drawings set the real number: email the plans and you get the figure.

What are TC1, TC2 and TC3?

Technical categories for how the ground behaves. TC1 is good ground and takes a standard raft. TC2 needs an engineered raft. TC3 is the hard ground: it can need a re-levellable foundation or piles, and it is where advice before you buy matters most. Christchurch has all three, sometimes on one street.

Should I talk to you before buying a section?

Yes. It is a ten-minute call and it is free. Mark will tell you what the ground under a section is likely to mean for the foundation: sometimes the honest answer is "walk away", and hearing it before you go unconditional is worth more than anything on this website.

Is ribraft better than a conventional slab?

For most Christchurch ground, yes: it is what we specialise in. A ribraft sits on pods with reinforced ribs, spreads load well, goes down fast, and handles this city's ground conditions better than old-style strip footings. Where it is not the right answer, we will say so and price what is.

Who coordinates the plumber, engineer and council?

We do. That is the whole point of Master Foundations: one crew books and runs the plumber, the surveyor, the engineer, the council inspections and the heating installer where there is one. You deal with Mark; everyone else is ours to chase.

I am a builder. Do you take the whole start of the build?

That is the preferred way to work: earthworks, foundation and the trades around them as one package, handed back ready for frames on the day we said. One number to ring while it runs, and the LBP sign-off with the handover.

Do you do multi-unit and commercial?

Multi-unit, yes: including the double pod system, priced from plans (POA), and the drone shots on the portfolio page are those jobs in progress. Commercial pads: ring Mark with the job and he will tell you.

The biggest answer, up front.

Pricing is the question under most of the others, so here it is, in full.

TC1 Polystyrene Raft

Cost effective, suitable for good ground.

from$112.00/m²

TC2 Polystyrene Raft

Engineered, suitable for most sites.

from$138.00/m²

Sustainable Plastic Raft

Recycled plastic pods, eco friendly.

TC1 from$135.00/m²

Multi-Unit

Including double pod system.

POA

The practical questions.

How does the job actually run, start to finish?

Seven steps: priced from plans, ground checked, site prepped, trades through, inspected, poured, handed back. The process page walks every step with what you see at each one.

How long does a foundation take?

The pour itself is a day. What takes the time is everything around it: consent, trades, inspections, weather windows. That is exactly the part we coordinate. Start the conversation early: the sooner the plans land, the sooner the moving parts get booked.

What do you need from me to quote?

Your plans. PDFs or photos of the drawings are both fine, and the address, so we can see what the ground is doing there. That is it. The upload is on the contact page; Mark prices from the drawings himself.

What happens if it rains?

We watch the forecast and pour when the concrete can cure properly, not when the calendar says. A day's slip beats a compromised slab, and you will always hear about it before it happens, not after.

Do you do underfloor heating?

Most foundations never have it. Where yours does, we coordinate the installer into the layout so the coils are in the right place before the concrete arrives, not an argument after it. The heating itself is the installer’s trade; the sequencing is ours.

Where do you work?

Christchurch first, and Canterbury and the surrounding areas. If you are on the edge of that, ring: the answer is usually yes for the right job.

Still got a question?

Call or text and Mark answers it himself, or email the plans and ask it in the same message.

HoursMonday to Friday, 8am to 5pm
Service areasChristchurch, across Canterbury

Details, then the drawings.

PDFs or photos of the drawings are both fine. Everything sent here lands with Mark himself.