Skip to main content

Everything a foundation needs.

Ribraft is the specialty. Around it, the full start of a Christchurch build: engineered systems for hard ground, insulated slabs, new-home groundwork, and the earthworks first.

Foundation construction, ground to finished raft.

Ribraft is the specialty, and most Christchurch sections get one. Where the ground argues, the system changes with it: engineered rafts on TC2, re-levellable designs on TC3, multi-unit pours where the job is bigger. The ground question gets answered before the price does.

  • Ribraft rafts on TC1 and TC2 ground
  • Engineered and re-levellable TC3 systems
  • Multi-unit and double pod pours
  • Set-downs and thickenings built to the plan
A full ribraft layout of pods, mesh and plumbing rough-in across a large foundation

Concrete and insulated slabs, warm from the pour.

The concrete side covers what a foundation crew should: the slabs, the footings, the finishing. The insulated side is where the difference shows, because the edge detail and the under-slab layer only go in while the concrete is still a plan.

  • Edge insulation detailed into the boxing
  • Under-slab insulation where the design calls
  • Underfloor heating coordinated into the pour
  • Sustainable Plastic Raft, TC1 from $135.00/m²
The insulated edge of a finished foundation slab, rigid insulation running under the concrete

New home builds, from bare section to frames.

The whole start of a house, run as one job: earthworks, trades, council and the foundation itself. Builders hand it over to protect the programme. People coming direct with plans hand it over because someone finally tells them what happens first.

  • Priced off your drawings, not off a rate card
  • Ground checked before the system is locked
  • Trades and council booked and chased by us
  • Signed off by a Licensed Building Practitioner (LBP)
A finished new-home foundation standing in open paddock, engineered footings visible

Earthworks and site prep, ground made ready.

Dig-out, hardfill, compaction and drainage prep, cut to the foundation design rather than to whatever suits the machine. The crew preparing the platform is the crew pouring on it, so the standard is the one the slab needs and there is no gap between two companies.

  • Topsoil stripped, platform cut to design level
  • Hardfill placed in lifts and compacted
  • Drainage prep run with the plumbing rough-in
  • Set-out surveyed against the consent
Top-down view of a prepared site: boxing set out and pod stacks delivered

Whichever door you come in, the job runs the same.

One crew coordinates the lot: plans in, ground checked, trades run, council passed, poured, handed back ready for frames.

01

Plans in

Priced from the drawings.

02

Ground + site

TC class confirmed, platform prepped.

03

Trades run

Plumber, engineer, heating: booked by us.

04

Council passed

Inspections met and ticked.

05

Poured and finished

Boxing day one, pods day two, mesh day three, then the pour.

06

Handed back

LBPsigned off, ready for frames.

Not sure which service is yours?

Email the plans, or ring and describe the job. Matching the system to the ground is our job, not yours.

HoursMonday to Friday, 8am to 5pm
Service areasChristchurch, across Canterbury

Details, then the drawings.

PDFs or photos of the drawings are both fine. Everything sent here lands with Mark himself.