Ribraft foundations, Christchurch.
The system this company is known for: polystyrene pods, steel mesh and reinforced ribs, poured in a day on the ground Christchurch actually has.
- 25+Years in construction


Where slab jobs go wrong.
When a slab job goes wrong, it is rarely a concrete problem. It is a coordination problem: a slab poured before the plumber finished, penetrations in the wrong place, no set-downs where the tiler needed them, levels the framing crew spent their first day packing out.
The other Christchurch classic is the wrong system for the ground: a standard raft on land that needed engineering, because nobody checked the TC class before quoting cheap. That one does not show up until it is the most expensive problem the house has.
- Poured before the under-slab trades were finished.
- Penetrations and set-downs missing or misplaced.
- The wrong system for the TC class, priced cheap up front.
- Nobody chasing council, so the build waits on a tick.
What a ribraft actually is.
A ribraft floats the house on an engineered concrete raft instead of digging strip footings into ground you cannot trust. Polystyrene pods grid out the floor, steel mesh and reinforced ribs run between them, and the whole thing pours as one slab: stiff, light on the ground, and fast.
That is why it took over Christchurch after the ground moved: a raft spreads load across the whole footprint, so it rides ground movement instead of cracking along it. On good TC1 gravel it is simply the quickest, cleanest way to a finished floor. On harder ground it is the starting point the engineered systems build from.
We pour these week in, week out. Boxing day one, pods day two, mesh day three. Concrete docketed from the plant, screeded and finished the day it goes down, not rushed.

Pods gridded out, ribs in the gaps, mesh over
How we pour it right.
The ribraft is step six of seven. Everything before it is why ours come back level, signed off and ready.
Priced from plans
Mark takes the quantities off your drawings himself.
Ground checked
TC class confirmed before the system is locked.
Site prepped
Hardfill compacted, drainage in, set-out surveyed.
Trades through
Plumbing rough-in, and heating coils in the right place if there are any.
Inspected
Council met on site and passed.
Poured and finished
Boxing day one, pods day two, mesh day three, then the pour.
Handed back
LBPsigned off, ready for frames.
The system, laid out.

Ready for concrete
Pods, mesh and rough-in

Pour day
The pump working the grid

New build, established street
Pods down, pour next

Finished slab
Ready for frames
Ribraft pricing, published.
The from-rates we quote from. Your TC class and your plans set the final figure.
TC1 Polystyrene Raft
Cost effective, suitable for good ground.
from$112.00/m²
TC2 Polystyrene Raft
Engineered, suitable for most sites.
from$138.00/m²
Sustainable Plastic Raft
Recycled plastic pods, eco friendly.
TC1 from$135.00/m²
Multi-unit and double pod systems are priced from plans (POA).
Ribraft questions.
Is ribraft right for my section?
If the ground is TC1 or TC2, almost certainly. On TC3 it depends what the ground has done: that is the re-levellable conversation, and it starts with a phone call before you commit to anything.
How long does a ribraft take to pour?
The pour itself is a day: pods and steel checked in the morning, concrete down, screeded and finished by the afternoon. The days after it are where patience pays, and we do not rush them.
What about underfloor heating in a ribraft?
Built for it, though most ribrafts never have it. Where you want it, the coils are coordinated into the layout before the pour and the installer is one of the trades we book, so the heating and the concrete never argue.
Price your ribraft.
TC1 ribraft starts from $112.00/m². Email your plans and Mark comes back with the real number, or ring 021 222 0952 and talk the ground through first.