Skip to main content
A ribraft foundation boxed and pod-laid across a Christchurch section, rib cages and steel mesh over the pods, ready for the pour

Ribraft foundations, Christchurch.

The system this company is known for: polystyrene pods, steel mesh and reinforced ribs, poured in a day on the ground Christchurch actually has.

  • 25+Years in construction
  • SiteSafe
  • Allied Concrete supplier

Where slab jobs go wrong.

When a slab job goes wrong, it is rarely a concrete problem. It is a coordination problem: a slab poured before the plumber finished, penetrations in the wrong place, no set-downs where the tiler needed them, levels the framing crew spent their first day packing out.

The other Christchurch classic is the wrong system for the ground: a standard raft on land that needed engineering, because nobody checked the TC class before quoting cheap. That one does not show up until it is the most expensive problem the house has.

  • Poured before the under-slab trades were finished.
  • Penetrations and set-downs missing or misplaced.
  • The wrong system for the TC class, priced cheap up front.
  • Nobody chasing council, so the build waits on a tick.

What a ribraft actually is.

A ribraft floats the house on an engineered concrete raft instead of digging strip footings into ground you cannot trust. Polystyrene pods grid out the floor, steel mesh and reinforced ribs run between them, and the whole thing pours as one slab: stiff, light on the ground, and fast.

That is why it took over Christchurch after the ground moved: a raft spreads load across the whole footprint, so it rides ground movement instead of cracking along it. On good TC1 gravel it is simply the quickest, cleanest way to a finished floor. On harder ground it is the starting point the engineered systems build from.

We pour these week in, week out. Boxing day one, pods day two, mesh day three. Concrete docketed from the plant, screeded and finished the day it goes down, not rushed.

Polystyrene pods gridded out with skinny gaps running both ways, rib cages and steel mesh over, ready for a ribraft pour

Pods gridded out, ribs in the gaps, mesh over

How we pour it right.

The ribraft is step six of seven. Everything before it is why ours come back level, signed off and ready.

01

Priced from plans

Mark takes the quantities off your drawings himself.

02

Ground checked

TC class confirmed before the system is locked.

03

Site prepped

Hardfill compacted, drainage in, set-out surveyed.

04

Trades through

Plumbing rough-in, and heating coils in the right place if there are any.

05

Inspected

Council met on site and passed.

06

Poured and finished

Boxing day one, pods day two, mesh day three, then the pour.

07

Handed back

LBPsigned off, ready for frames.

The system, laid out.

A full ribraft layout of pods, mesh and plumbing rough-in across a large foundation

Ready for concrete

Pods, mesh and rough-in

Top-down view of a concrete pump arm reaching across a foundation mid-pour

Pour day

The pump working the grid

A single pod-laid foundation pad inside timber boxing, on a section in an established, lived-in street

New build, established street

Pods down, pour next

A crisp finished foundation slab and footing on compacted gravel

Finished slab

Ready for frames

Ribraft pricing, published.

The from-rates we quote from. Your TC class and your plans set the final figure.

TC1 Polystyrene Raft

Cost effective, suitable for good ground.

from$112.00/m²

TC2 Polystyrene Raft

Engineered, suitable for most sites.

from$138.00/m²

Sustainable Plastic Raft

Recycled plastic pods, eco friendly.

TC1 from$135.00/m²

Multi-unit and double pod systems are priced from plans (POA).

Ribraft questions.

Is ribraft right for my section?

If the ground is TC1 or TC2, almost certainly. On TC3 it depends what the ground has done: that is the re-levellable conversation, and it starts with a phone call before you commit to anything.

How long does a ribraft take to pour?

The pour itself is a day: pods and steel checked in the morning, concrete down, screeded and finished by the afternoon. The days after it are where patience pays, and we do not rush them.

What about underfloor heating in a ribraft?

Built for it, though most ribrafts never have it. Where you want it, the coils are coordinated into the layout before the pour and the installer is one of the trades we book, so the heating and the concrete never argue.

Price your ribraft.

TC1 ribraft starts from $112.00/m². Email your plans and Mark comes back with the real number, or ring 021 222 0952 and talk the ground through first.

HoursMonday to Friday, 8am to 5pm
Service areasChristchurch, across Canterbury

Details, then the drawings.

PDFs or photos of the drawings are both fine. Everything sent here lands with Mark himself.