Skip to main content
Back to portfolio

New build, established street

Residential

The pod layout in, on a street already lived in.

The ribraft pod layout down and ready for mesh, on a street where everyone else already lives there. This is the stage the system is named for: pods placed in their grid, ribs between them, the pour to come.

Working an established street means the pour day is booked and kept: the surveyor, the pump and the inspector all landed on the same morning, because a street full of neighbours is not the place to run a job loose.

Service areas
Christchurch, across Canterbury
Sign-off
LBPevery job
Credentials
SiteSafeAllied Concrete supplier

Frames from our own sites, standing in while this job's full set lands.