Back to portfolio
Rural new build
Residential
The main slab down, separate footings formed alongside it.
The main slab poured and finished, with separate engineered footings formed up alongside it for the structures that follow. Rural sections trade tight access for distance: the coordination is the same, the trucks just drive further.
The footings are the tell that this is foundation construction rather than a pour-and-leave: formed, poured and finished in sequence with the slab, so the whole start of the build lands together.
- Service areas
- Christchurch, across Canterbury
- Sign-off
- LBPevery job
- Credentials


Frames from our own sites, standing in while this job's full set lands.
